Circular building with mezzanine for Landal Klein Oisterwijk

For Landal Klein Oisterwijk, we constructed a new mezzanine floor and canteen facilities inside the existing building. Our team handled the full assembly and installation of the Skellet- structure, including the staircase, railings, floor panels and sandwich panels.

In addition to the mezzanine floor, we also realized a fully circular company hall measuring 15 x 35 meters.

More information about relevant processes in this project